Talk about living before style
List household size, cooking habits, work and study routines, and storage needs. Describe everyday situations rather than relying only on style labels.
Define the scope
Separate essentials, desirable improvements and items that can wait. Structural and gas-related work requires assessment by qualified professionals, not visual guesswork.
Discuss budget alongside scope
List construction, materials, bespoke fittings, furnishings and possible changes separately. Confirm cost and timing whenever the scope changes.
Plan material lead times early
Map the sequence of measuring, approval, ordering, production, delivery and installation. Bespoke products especially require verified site dimensions and installation conditions.
Agree on inspections and communication
Before work starts, confirm responsibilities, reporting methods, inspection milestones and the corrective-work process to reduce missed information.
Back to the journal